Keys to best practice comminution
In this example the SAGDesign (SDT) ore hardness is 10 kWh/t (to grind the ore from F 80 152 mm to T 80 1.7 mm) and the SAG ground Bond Ball Mill Work Index is 15 kWh/t. Table 2 shows alternate equipment selections that will produce 471 t/h, (10,400 t/d and 3.8 million tonnes per annum) at 92% availability.