A novel multi-path sand-control screen and its application in gravel …
The first stage started from the beginning and continued until the gravel reached the packing tool installed at the heel of the horizontal wellbore. This stage lasted for 52 min with a pump rate of 5.6 bpm and a back-flow rate of 5.5 bpm. The gravel was mixed at the surface simultaneously with an average injection rate of 115lb/min.
WhatsApp: +86 18221755073