Mining Levels: Stations, Drifts, & Crosscuts
At one large gold mine in Canada it was found that by driving wide drifts the cost per ton of ore from the drifts was only 1.8 times the cost per ton of stope ore. In steeply dipping tabular deposits, development drifts in ore are often driven the full width of the ore if it is not too wide.
WhatsApp: +86 18221755073